DM Electronics
Network & Cabling — DM Electronics
DM Electronics · Network & Cabling

Cabling that stays labelled

We plan, pull and terminate ethernet, coaxial and fibre runs for villas, apartments and offices — concealed routes, tested ports and a patch panel you can actually work from later.

Cat6 / 6aData standard
100%Runs certified
UAEAjman · Sharjah · Dubai
Cable run summary
Cat6 runs24
Total length680 m
Termination quality100%
Work Gallery

Cabling done clean.
Racks done right.

A look at recent structured cabling, rack dressing, and network terminations — labelled, tested, and built to stay tidy years later.

Structured cabling panel
Panel 01
Panel 02
Panel 03
Structured cabling in a network rack
Network switches and labelled patch leads
Why choose us

Ports you will not have to chase later

Slow wifi and dead wall sockets usually start behind the plaster. We map every run before a hole is drilled, keep data away from power, and terminate to a labelled patch panel so adding a camera or access point later is a patch lead — not a rebuild.

New villa backbone, office floor, or a handful of extra points in a finished apartment: the same standard applies. Every cable is tested before we leave.

  • Route survey before any chasing or trunking
  • Cat6 / Cat6a, RG6 coaxial and fibre as required
  • Keystone jacks, faceplates and labelled panels
  • Certification report and port map on handover
Enlarged view
Where we wire

Built for how the space is used

The cable plan follows the building, not a generic template.

Homes

Villas & apartments

TV points, office rooms, CCTV homeruns and mesh nodes — pulled through conduits or trunking with as little disruption as the finish allows.

Work

Offices & shops

Desk drops, POS points, WiFi APs and a tidy comms cabinet so staff are not sharing one overloaded socket.

Expand

Add-on runs

Extra ports on an existing network, re-termination of failed links, and fibre between floors or outbuildings.

How it works

From plan to patch panel

Four stages. Nothing left undocumented behind the walls.

01

Route planning

We count ports, pick cabinet location and mark paths that respect bend radius and power separation.

02

Pulling & protection

Cables go through conduit or trunking — no stretched jackets, no sharp edges, no mixed power and data in the same chase.

03

Termination

RJ45 jacks, coaxial fittings and fibre terminations done to spec, then dressed into a labelled panel.

04

Test & map

Every run is certified. You get a port map so the next technician — or you — knows what is where.

Track record

Numbers from ten years on the job

500+
Installations completed
98%
Client satisfaction rate
10+
Years of experience
3
Emirates served — Ajman, Sharjah, Dubai
What we offer

Network & cabling services

From a single extra port to a full building backbone.

Structured ethernet

Cat6 and Cat6a homeruns to rooms, desks and access points, terminated and tested for gigabit traffic.

Coaxial & TV cabling

RG6 for satellite, cable and multi-room TV distribution with clean F-type terminations.

Fibre links

Single-mode runs between floors or buildings where copper cannot cover the distance cleanly.

Racks & patch panels

Cabinets dressed with managers, labels and enough slack to add devices later without a mess.

Conduit & trunking

Protected routes through walls, ceilings and outdoor runs so jackets are not left exposed.

Fault finding

Dead ports, split pairs and damaged runs traced, re-terminated or replaced and retested.

Questions

Frequently asked questions

Cat6 covers gigabit reliably for most homes. We specify Cat6a where you want headroom for 10-gigabit links, longer runs, or a denser office floor. We will tell you which is worth the extra cost on site.

Yes. We use existing conduits, surface trunking or fishing techniques to keep chasing to a minimum. We discuss the least-visible route before any work starts.

Every run is tested before handover. You receive a labelled port map showing destination, length and pass status so future changes are straightforward.

Yes. We extend from the existing cabinet where possible, add faceplates and patch into the current panel so the new ports sit on the same numbering scheme.

A villa with six to eight data points is usually one to two days, depending on wall finishes and whether TV coaxial or fibre is included. We confirm a schedule after the survey.

Ready for a properly wired network?

Book a cabling survey today and get labelled, tested connections from a team you can call back for years.

Scroll to Top